Projects

Addenbrookes Hospital NHS

Powersystems were employed to design, install and commission a new 33 kV primary substation on the hospitals site.

Crystal Rig II 138 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 138 MW Crystal Rig II Wind Farm project.

Clocaenog Forest 96 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 96 MW Clocaenog Wind Farm project.

Fraisthorpe 29.7 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 29.7 MW Fraisthorpe Wind Farm project.

Marlborough College Grid Connection and Infrastructure Project

Powersystems designed, installed, tested and commissioned the electrical infrastructure and grid connection for Marlborough College.

Wandylaw 20.5 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 20.5 MW Wandylaw Wind Farm project.

Millbrook Proving Ground

As a high voltage engineering contractor Powersystems were the preferred partner appointed for designing, procuring, installing and commissioning the HV electrical infrastructure for the new Battery Testing and Powertrain facilities at Millbrook Proving Ground.

Dyson Hullavington Airfield HV Infrastructure Project

Powersystems has delivered the practical works for the design, supply, installation, testing and commissioning for the electrical infrastructure at Hullavington Airfield for Dyson.

Beavertown Brewery Project

Powersystems were delighted to meet the critical milestones of this project enabling the client to increase the power supply to ultimately upscale the Beavertown brewery business. The work was completed on time and to budget ready for the first production of beer due for March 2020.

Bryn Blaen 14.1 MW Wind Farm

Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 14.1 MW Bryn Blaen Wind Farm project.