Powersystems engineers were involved with designing the earthing system, the HV circuits, the cable containment and some the LV cables for the DRUPS system.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 228 MW Pen-Y-Cymoedd Wind Farm project.
Powersystems designed, installed, tested and commissioned the electrical infrastructure for the 75.9 MW Mid Hill Wind Farm project.
To help smooth the electrical supply network on Shetland, a 6 MW BESS was cabled, installed and commissioned by Powersystems
Powersystems were appointed by Connect Utilities now GTC to design and build a new 24MVA 33/11 kV primary substation.
The installation of a new scrap metal processing plant at the Sims Metal Newport site required a connection that would cope with the starting and stopping of a 6 MW 11 kV crusher motor.
Powersystems overcame expensive project challenges and negotiated a connection to the 132 kV overhead line that passed within 300 m of the generation compound.
Powersystems were awarded the turnkey design and build contract for the new generation station for 30 No reciprocating gas engines with an export capacity of 30 MW.